Approval for £30m distribution centre in Newtownabbey with up to 150 new jobs expected
Planning permission was granted for construction of a new £30m storage and distribution centre at Houston Business Park, Newtownabbey, at a meeting of Antrim and Newtownabbey Borough Council’s Planning Committee on Monday evening.
The committee was told the proposed facility comprising of three storage and distribution units, car parking and landscaping, south of 610-626 Doagh Road is expected to result in the creation of 150 jobs.
A planning officer said the principle of development is “considered acceptable” and scale and lay-out is considered “appropriate” for the surrounding area. The officer indicated a number of concerns were raised locally over impact on amenity, boundary treatment, landscaping, traffic and vehicle movement and noise impact.
Houston’s Corner Roundabout, which links to the Ballynure Road (A8), is approximately 0.2 miles to the west.


A committee report said: “The site comprises an area of land situated off the Doagh Road, made up of a series of agricultural fields. The proposal includes three individual storage and distribution units, (in replacement of one larger unit) with access via an existing road network which is proposed to extend to provide access to two of the units.
“The previous approval and subsequent Section 54 application contained a landscaping scheme which has commenced on the site. Letters of objection have raised concerns in relation to the adequacy of the existing landscaping, the type and timing of the proposed landscaping and the need for any proposed landscaping to be conditioned to be carried out prior to the development commencing to allow for more mitigation during construction works.
“The proposed landscaping plan indicates that the existing landscaping buffer located to the north of the site along the Doagh Road which wraps around the rear of the private amenity space of the adjacent residential properties is to be retained and protected during construction.
“Overall, it is considered that the proposed planting and retention of existing planting is considered acceptable in the context of the site.”
HGV Movements
Speaking at the meeting, a local resident expressed concern over the proposed new lay-out, potential frequency of HGV movements, proximity of her property and horses to the site as well as concern for the health and well-being of residents and animals.
Another neighbour expressed concern for safety of horses and riders in the area. He highlighted an anticipated increase in HGV and van movements during night time and a 44 per cent increase in traffic between 5-7am.
Planning agent Tom Stokes said the proposed distribution centre would be a logistics hub for DHL an international logistics company.
Mr Stokes described the investment by the applicant Kenmark N0 2 Ltd and tenant DHL as “significant” on land which has been identified for employment use. He said the sum of £1m has been spent on “bringing in electricity from a mile away”.
Macedon Ulster Unionist Councillor Robert Foster asked about the nature of planting. He was advised it was a “native woodland mix” and some planting had taken place in “very wet ground” at one stage and did not “take”.
In reply to a query from Threemilewater Alliance Alderman Tom Campbell over an anticipated increase in traffic, Mr Stokes said the council’s environmental health department has indicated that “amenity can be protected”.
Planning permission was granted after nine councillors voted in favour with one against.
Michelle Weir, Local Democracy Reporter