Bridge section leaves Lisburn

THE longest steel bridge section ever to be fabricated and transported by the McGrath Group in Lisburn has left the factory premises en route to Dublin for specialist painting.

Installation of the structure is scheduled to take place on October 2 on the N4 motorway at Mullingar, Co Meath.

The latest bridge is part of an €800,000 contract awarded to McGrath Group for the supply of bridges and gantries to the motorway infrastructure in the Republic of Ireland.

Hide Ad
Hide Ad

The Bridge, weighing 35 tonnes, was fabricated at McGrath Group’s 120,000 square feet purpose built facility at Lissue Industrial Estate.

This is the largest of a number of bridges that the McGrath Group has recently completed which includes Kildare Railway Station, a footbridge on the A40 dual carriageway in London and a number of bridges at Pitsea Railway Station in Essex.

As a result of their earlier successful contracts on the Olympics, McGrath Group have also recently received new business as part of the legacy works at the Olympic Stadium, the Aquatics Centre and the Olympic Velodrome.