Church Street drainage ‘only temporary’

Contractors say they will be replacing concrete drainage mouldings on Church Street once the permanent granite channels arrive.

TAL say that temporary drainage channels - which are blocked at the kerbside - have been put in place as a short term measure.

placeholder image

“When the granite channels are received, they will return and change them over as quickly as possible,” said a spokesman.

Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice