Berry welcomes £490k Infrastructure investments for busy Tandragee to Poyntzpass A27 route

New £490k Infrastructure road improvement works for the busy Tandragee to Poyntzpass A27 route has began after years of lobbying.

The news was welcomed by local councillor Alderman Paul Berry who was involved in intensive lobbying for two years – raising ‘serious safety hazards’ on the busy thoroughfare.

-

placeholder image
Read More
Conor Lamph: Heartbreak as young father of 3, described as 'an absolute gentlema...
Main route between Tandragee and Poyntzpass - the A27 - which is undergoing major infrastructure work.placeholder image
Main route between Tandragee and Poyntzpass - the A27 - which is undergoing major infrastructure work.

-

The extensive structural investment, officially announced by Infrastructure Minister Liz Kimmins, will introduce essential resurfacing, widespread patching, enhanced drainage systems, and vital verge stabilization along the commuter corridor.

Alderman Berry, who sits on Armagh, Banbridge and Craigavon Council, said: “I am absolutely delighted that the Department for Infrastructure has listened to our persistent calls and committed £490,000 to this crucial stretch of the A27. For the past two years, I have lobbied tirelessly for physical interventions on this heavily-trafficked route.

"Local motorists use this road daily, and the degradation has posed growing safety risks. I am particularly pleased to see that this extensive scheme specifically targets Rutherford’s Corner, the Markethill Road section, and the roundabout at the bottom of Tandragee.

"These are notorious hot spots that required urgent action, and these works will go a long way in restoring confidence for everyday commuters and commercial drivers alike."

The major engineering project is currently underway and is projected to reach completion by Friday, 4 December 2026. To accommodate the scale of the repairs while protecting on-site crews, the Department has structured traffic management into two distinct daytime phases:

  • Phase 1 (Monday, 9 November – Friday, 13 November): Daily lane closures managed by temporary traffic signals between 9:30 am and 4:30 pm.
  • Phase 2 (Monday, 16 November – Friday, 4 December): Full weekday road closures in effect from 9:30 am to 4:30 pm.

During the full weekday closures, a designated diversion route will guide motorists via the A27 Shepherds Way, A28 Armagh Road, and the B3 Tandragee Road at Markethill (and vice versa).

Alderman Berry admitted a scheme of this magnitude will inevitably cause disruption. He has been contacted by local businesses concerned about the immediate impact on their trading, footfall, and deliveries.

"I urge all commuters, school transport providers, and delivery drivers to review the diversion routes and factor extra travel time into their journeys over the next few weeks. The short-term inconvenience will be challenging, but it will ultimately result in a safer, smoother, and completely revitalized A27.”

Related topics:
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice