MOT crisis came after Larne centre inspection

The first cracks to be identified in lifts at MOT test centres in Northern Ireland were detected at the Driver Vehicle Agency facility in Larne, findings have shown.
Larne MOT centre (image Google).Larne MOT centre (image Google).
Larne MOT centre (image Google).

According to an independent investigation published by the Department for Infrastructure, these were detected on November 6 last year during an inspection before 55 lifts were taken out of operation due to faults in scissor lifts at MOT centres across Northern Ireland.

The report indicated that “fatigue cracks” were found in two of the three lifts examined at the Larne centre and were taken out of service.

Hide Ad
Hide Ad

Repairs were expected to have been carried out by November 27 but had still not been completed by January 21.

The report added that maintenance contractor MAHA advised it had “no immediate concern” regarding the safe operation of these lifts and it was being treated as a “routine maintenance and repair issue”.

On January 22, 2020, a decision was taken by DVA senior management to withdraw all lifts in the MOT centre network from service that had not been subject to repair and further inspection.

As a result, 10 MOT test centres were “severely impacted” with cracks identified within 14 lifts.

Hide Ad
Hide Ad

The decision to suspend the use of all 55 lifts due to safety concerns was taken by  the DVA chief executive on January 27.

Infrastructure Minister Nicola Mallon described the situation as “unacceptable” blaming “an inadequate inspection regime and metal fatigue”.

She stated: “Most vehicle testing services at MOT centres were suspended in late January, for safety reasons, given the faults identified in the scissor lifts across all of the MOT centres.

“The investigation has provided clarity on the timeline of events and the auditors concluded that it was reasonable for DVA to place reliance on the equipment manufacturer, supplier and maintenance contractor, MAHA, and the independent engineering insurance inspection reports.”

Hide Ad
Hide Ad

The minister reported that new lifts are now ready for installation “on a phased basis” and will be installed in those centres not required as part of the Covid-19 response.

Michelle Weir, Local Democracy Reporter.

--

A message from the Editor:

Thank you for reading this story on our website. While I have your attention, I also have an important request to make of you.

In order for us to continue to provide high quality and trusted local news on this free-to-read site, I am asking you to also please purchase a copy of our newspaper whenever you are able to do so.

Our journalists are highly trained and our content is independently regulated by IPSO to some of the most rigorous standards in the world. But being your eyes and ears comes at a price. So we need your support more than ever to buy our newspapers during this crisis.

Hide Ad
Hide Ad

With the coronavirus lockdown having a major impact on many of our local valued advertisers - and consequently the advertising that we receive - we are more reliant than ever on you helping us to provide you with news and information by buying a copy of our newspaper when you can safely.

You can also enjoy unlimited access to the best news from across Northern Ireland and the UK by subscribing to newsletter.co.uk

With a digital subscription, you can read more than five articles, see fewer ads, enjoy faster load times, and get access to exclusive newsletters and content. Visit https://www.newsletter.co.uk/subscriptions now to sign up.