Plans lodged for dwellings on infill site near Portadown

An outline planning application has been lodged for the construction of two detached dwellings and garages on an infill site between 12 Drumnasoo Road and 156 Loughgall Road, outside Portadown.

The site in question is a field in the townland of Ballintaggart, a mile or so west of Portadown.

Two detached houses and garages could be built in this field, next to 12 Drumnasoo Road, outside Portadown. Credit: Googleplaceholder image
Two detached houses and garages could be built in this field, next to 12 Drumnasoo Road, outside Portadown. Credit: Google

The outline planning application was lodged on November 11 by Paul McAlister Architects Ltd, The Barn Studio, Portadown, on behalf of David McCullough, Loughgall Road, Portadown.

A concept statement, submitted with the planning application, deems the plans to be compliant with current planning rules: “POLICY CTY 8 of the new PPS 21 draft makes the following comments – Ribbon Development.

An approximate illustration of a possible layout for the two dwellings and garages. Image: ABC planning portalplaceholder image
An approximate illustration of a possible layout for the two dwellings and garages. Image: ABC planning portal

“An exception will be permitted for the development of a small gap site sufficient only to accommodate up to a maximum of two houses within an otherwise substantial and continuously built-up frontage.

“In terms of size, scale, sitting and plot size [the proposal] meets other planning policy and environmental requirements.

“The proposed site has been selected as an opportunity to fill a gap site in a densely populated location. The site is well integrated with established boundaries on all sides.

“Existing dwellings on the road are located close to the roads edge, and our proposal shows a similar arrangement, with garages and gardens located to the rear of the dwelling.

“Under the current guidelines of PPS21, the site fits all criteria to be considered suitable for development as a gap site.”

The planning process is still at a very early stage.

Related topics:
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice