Ballymena roadworks programmes this week
Road users may wish to plan their journeys in advance with roadworks programmes taking place in the Ballymena area this week.
Closures will operate daily unless otherwise stated.
Galgorm Road, Ballymena
There will be a lane closure from 30m Southwest from The Smithfield Arms to North Road on Monday, March 23 from 7:00pm until 11:00pm.


The closure is required for BT UG cabling works.
Traffic controls will operate, with delays of up to 5 minutes expected.
Pennybridge Industrial Estate, Ballymena
There will be a road closure from Ballee Road East to Pennybridge Industrial Estate from Monday, March 23 at 8:00am until Monday, March 30 at 6:00pm.
The closure is required for carriageway resurfacing.
A diversion will operate with an alternative route via: (Diversion 1) U2212 Ballee Road East, A0026 Larne Road Roundabout, A0026 Larne Road Link, U2212 Larne Road, U2211 Larne Road or (Diversion 2) U2211 Larne Road, A0026 Pennybridge Roundabout, A0026 Larne Road Link, A0026 Larne Road Roundabout, and A0026 Larne Road.
Delays expected of up to 5 minutes are expected.
Glenravel Road, Ballymena
There will be a continuous lane closure from no.1 Dunaghy Wood to 250m past no.1 Dunaghy Wood until Friday, May 29 at 6:00pm.
The closure is required for construction of road widening works for the new Lady Queen of Peace School.
Traffic controls will operate, with delays of between 5-15 minutes expected.
Moorfields Road, Ballymena
There will be a continuous lane closure from the Larne Road roundabout to 50m beyond Wardlow Road until Tuesday, May 5 at 6:00pm.
The closure is required for kerbing and resurfacing.
Traffic controls will operate, with delays of up to 5 minutes expected.