Ballymena roadworks this week
Road users may wish to plan their journeys in advance with roadworks programmes taking place in the Ballymena area this week.
Closures will operate daily unless otherwise stated.
Glenravel Road, Ballymena
There will be a continuous lane closure from No.1 Dunaghy Wood to 250m past No.1 Dunaghy Wood from Friday, May 29 at 7:00am until Friday, August 14 at 6:00pm.


The closure is required for construction of road widening works for the new Lady Queen of Peace School; alternating lane works are being undertaken by manned traffic control.
Traffic controls will operate, with delays of up to 5 minutes expected.
Shellinghill Road, Ballymena
There will be a road closure from Ambleside to Broughdone Lane from Monday, May 25 at 8:00am until Friday, May 29 at 6:00pm.
The closure is required for carriageway resurfacing.
A diversion will operate with an alternative route via C0057 Shellinghill Road, C0057 Tullygrawley Road, C0056 Fenagh Road, C0056 Station Road, B0062 Ballymena Road, and B0062 Main Street.
Delays of up to 5 minutes are expected.
Railway Street, Ballymena
There will be a lane closure from the junction with Waveney Road to the junction with Queen Street on Sunday, May 31 from 7:00am until 12:00pm.
The closure is required for NI Water - CCTV surveying.
Traffic controls will operate, with delays of up to 5 minutes expected.
Waveney Road, Ballymena
There will be a lane closure from Clonavon Terrace to Waveney Mews on Friday, May 29 from 9:30am until 4:30pm.
The closure is required for fibre installation to a customer’s house.
Traffic controls will operate, with delays of up to 5 minutes expected.
Galgorm Road, Ballymena
There will be a lane closure from 200m west of the junction with Ballykennedy Road to the junction with Lisnafillon Road on Monday, May 25 from 9:30am until 1:00pm.
The closure is required for NIE tree cutting.
Traffic controls will operate, with delays of up to 5 minutes expected.
Lisnafillon Road, Ballymena
There will be a road closure from the junction with Cardonaghy Road to the junction with Russellstown Road on Monday, May 25 from 1:00pm until 5:00pm.
The closure is required for NIE tree cutting.
A diversion will operate with an alternative route via U2034 Lisnafillon Road, B0093 Cardonaghy Road, B0093 Cullybackey Road, A0042 Ballymena Road, A0042 Galgorm Road, and U2036 Lisnafillon Road.
Delays of up to 5 minutes are expected.
Crankill Road, Ballymena
There will be an overnight only lane closure from Lisnasoo Road to the Teeshan roundabout from Wednesday, May 27 at 10:00pm until Monday, June 1 at 6:00am.
The closure is required for a DFI Roads maintenance scheme.
Delays of up to 5 minutes are expected.
Galgorm Road, Ballymena
There will be a lane closure from Old Galgorm Road to Cambridge Avenue until Tuesday, June 30 at 4:30pm.
The closure is required for resurfacing work.
Traffic controls will operate, with delays of up to 5 minutes expected.
Moorfields Road, Ballymena
There will be a continuous one way closure from the Larne Road roundabout to the Tully Road junction until Friday, May 29 at 6:00pm.
The closure is required for resurfacing.
A diversion will operate with an alternative route via:
Diversion 1: A0026 Larne Road Roundabout, A0026 Larne Road, A0026 Ballee Road East, A0026 Lisnevenagh Road, A0026 Dunsilly Roundabout, M0022 M22 Dunsilly Roundabout On-slip Road (South Bound), M0002 M2 Motorway (South Bound), M0002 M2 Templepatrick Interchange Off-slip Road (South Bound), A0057 Ballyclare Road, A0057 Templepatrick Road, A0008 Belfast Road, and A0008 Larne Road.
Diversion 2: A0026 Larne Road Roundabout, A0026 Larne Road, A0026 Ballee Road East, A0026 Lisnevenagh Road, A0026 Dunsilly Roundabout, A0026 Ballymena Road, B0518 Stiles Way, B0095 Greystone Road, B0518 Ballycraigy Road, A0006 Belfast Road, A0057 Antrim Road, A0006 Antrim Road, A0057 Ballyclare Road, A0057 Templepatrick Road, A0008 Belfast Road, and A0008 Larne Road.
Delays of over 15 minutes are expected.
Glenravel Road, Ballymena
There will be a continuous lane closure from no.1 Dunaghy Wood to 250m past no.1 Dunaghy Wood until Friday, May 29 at 6:00pm.
The closure is required for construction of road widening works for the new Lady Queen of Peace School.
Traffic controls will operate, with delays of between 5-15 minutes expected.