Ballymena roadworks this week
Road users may wish to plan their journeys in advance with roadworks programmes taking place in the Ballymena area this week.
Lisnevenagh Road, Ballymena
A lane closure will be in place from Ballee roundabout to Ross Park from 9.30am until 4.30pm on Thursday, December 3.
The closure is required to replace a knockdown column by DfI Northern.


Delays of up to five minutes are expected.
Galgorm Road, Ballymena
A lane closure will be in place at number 293 Galgorm Road from 9.30am on Monday, November 30 until 4.30pm on Tuesday, December 1.
The work involves the installation of a new gas connection by Firmus Energy, with two-way traffic lights operating.
Delays of up to five minutes are expected.
North Road, Ballymena
A lane closure will be in place between Bridge Street and Galgorm Road from 9.30am until 4.30pm on Monday, November 30.
The closure is required for resurfacing work by DfI Roads.
Delays of up to five minutes are expected.
Grove Road, Ballymena
A lane closure will be in place between Doury Road and Ballyloughan Brow from 9.30am until 4.30pm on Monday, November 30.
The closure is required for resurfacing work by DfI Roads.
Delays of up to five minutes are expected.
Doagh Road, Kells
A road closure will be in place between the section boundary and the junction with Barnish Road from 8am on Monday, November 30 until 6pm on Tuesday, December 22.
The closure is required for carriageway resurfacing by DfI Northern.
A diversion will be in place via Doagh Road, Tully Road, Moorfields Road, Collin Road, Rashee Road, Doagh Road, Ballyclare Road, Ballymena Road and Main Street.
Delays of between five and 15 minutes are expected.
Ballycowan Road, Ballymena
A road closure will be in place from 50m east of number 81 to 50m west of number 81 from 8am until 6pm on Wednesday, December 2.
The closure is required for poling works by BT Openreach.
A diversion will be in place via Liminary Road, Station Road, Main Street, Greenfield Road and Shankbridge Road.
Delays of up to five minutes are expected.
Buckna Road, Ballymena
A lane closure will be in place between The Cuttings and Rosehill Road from 9.30am until 4.30pm on Monday, November 30.
The restriction is required for the installation of fibre broadband to a customer's home at 115 Buckna Road. The work is being carried out by Fibrus.
Delays of up to five minutes are expected.