Upcoming road and lane closures in the Ballymena area
Road users may wish to plan their journeys in advance with roadworks programmes taking place in the Ballymena area this week.
Closures will operate daily unless otherwise stated.
Moorfields Road, Ballymena
There will be a continuous lane closure from the Larne Road roundabout to 50m beyond Wardlow Road from Monday, February 16 at 7:30am until Tuesday, May 5 at 6:00pm.


The closure is required for kerbing and resurfacing.
Traffic controls to operate, with delays of up to 5 minutes expected.
Larne Road Link, Ballymena
There will be a continuous lane closure from Bridge Street link to a point 300m east of Bridge Street link until Friday, February 20 at 6:00pm.
The closure is required to repair gravity sewer (4m deep).
Lane closure (country bound) between Bridge Street and Braidwater Roundabout and lane closure (town bound) between Braidwater Roundabout and Bridge Street.
Traffic controls to operate, with delays of up to 5 minutes expected.
Church Road, Ballymena
There will be a lane closure from Douglas Road to Collin Road on Wednesday, February 18 from 9:30am until 4:30pm.
The closure required for fibre installation to a customer’s house.
Traffic controls to operate, with delays of up to 5 minutes expected.
Ballylig Road, Ballymena
There will be a road closure from 150m southbound from No.17 to 150m northbound from No.17 on Monday, February 16 from 8:00am until 6:00pm.
The closure is required for BT poling works; local access will be maintained.
A diversion will operate with an alternative route via U2127 Ballylig Road, U2126 Longmore Road, and A0042 Carnlough Road.
Delays of up to 5 minutes are expected.
Raceview Road, Ballymena
There will be a lane closure from Ballymena Golf Club to Woodside Road on Friday, February 20 from 9:30am until 4:30pm.
The closure is required for fibre installation to a customer’s house.
Traffic controls to operate, with delays of up to 5 minutes expected.
Crankill Road, Ballymena
There will be a lane closure from 100m before no.171 Crankill Road to 100m after no.171 Crankill Road on Tuesday, February 17 from 9:30am until 4:30pm.
The closure is required for fibre installation to a customer’s house.
Traffic controls to operate, with delays of up to 5 minutes expected.
Cushendall Road, Ballymena
There will be a lane closure from Clogher Road to Ballygarvey Road on Tuesday, February 17 from 9:30am until 4:30pm.
The closure is required for fibre installation to a customer’s house.
Traffic controls to operate, with delays of up to 5 minutes expected.
Moorfields Road, Ballymena
There will be a lane closure from 150m east of Rathkeel junction to 150m west of Rathkeel junction on Thursday, February 19 from 9:30am until 4:30pm.
The closure is required for BT poling and cabling works.
Traffic controls to operate, with delays of up to 5 minutes expected.
Lisnevenagh Road, Ballymena
There will be a lane closure from Ballee West Link to Ross Park on Monday, February 16 at 9:30am until Wednesday, February 18 at 4:30pm.
The closure is required to repair a gravity sewer.
Traffic controls to operate, with delays of up to 5 minutes expected.